Sand and Dust Test Chamber – Code of Practice and Key Technical Details (Conforming to GB/T 2423.37, GB 4208, IEC 60529, ISO 20653, etc.)

Source:LINPIN Time:2025-09-12 Category:Industry News

A sand and dust test chamber is the core item of equipment used to simulate desert, arid and industrial high-dust environments. The quality of its operation directly determines a product’s IP protection rating, reliability life and market-access qualification. Based on the principles of “risk anticipation, process control and result traceability”, this paper systematically lists 27 key technical details covering everything from power-on preparation to shutdown and maintenance, providing laboratory staff, third-party inspection bodies and manufacturing engineers with practical, actionable guidance.
sand and dust test chamber
II. Systematic pre-use checks
2.1 Electrical safety verification
a) Rated supply: three-phase five-wire AC 380 V ±10 %, 50 Hz ±0.5 Hz; PE conductor impedance ≤ 4 Ω.
b) Stabiliser: external AVC stabiliser (accuracy ≤ ±2 %) to prevent compressor or vibrator trip due to voltage sag.
c) Insulation resistance: measure phase–earth and phase–phase with a 500 V megger; ≥ 20 MΩ cold, ≥ 5 MΩ hot.
d) Residual-current device: type B RCD, 30 mA, trip time ≤ 100 ms, preventing micro-shorts caused by conductive dust films.
2.2 Air supply and exhaust
a) Compressed air: dew-point ≤ –40 °C, particles ≤ 0.1 μm, oil mist ≤ 0.1 mg/m3, pressure 0.5–0.7 MPa.
b) Exhaust: φ110 mm port on chamber roof, connected to HEPA + bag filter in series; terminal velocity ≥ 15 m/s, ensuring dust concentration ≤ 0.15 mg/m3 at 2 m (meeting GB 16297 un-organised-emission limit).
2.3 Talc pre-treatment
a) Sieving: dry-sieved through 200 mesh (75 μm), residue ≤ 2 %.
b) Drying: 105 °C ±2 °C for 4 h, moisture ≤ 0.5 %.
c) Re-use limit: same batch used ≤ 20 cycles to prevent moisture absorption and agglomeration.
III. Sample mounting and fixture design
3.1 Load cross-section
Total projected sample area ≤ 50 % of working-section area; any single direction ≤ 70 % to avoid bypass flow.
3.2 Fixture material
6061-T6 aluminium alloy or SUS304, anodised or brushed; no organic coatings that could shed and contaminate the dust.
3.3 Earthing
Fixture connected to chamber wall equipotential bond; earth resistance ≤ 1 Ω to prevent electrostatic dust attraction.
IV. Parameter setting and calibration
4.1 Temperature
a) Set-points: 23 °C, 55 °C, 85 °C; calibrated with external Pt100 sensors (±0.15 °C) in 9-point grid per GB/T 5170.2.
b) Heating rate: ≤ 1 °C/min to avoid instantaneous seal distortion.
4.2 Dust concentration
Laser turbidity meter (0–10 g/m3, linearity ±2 %), sampling 50 mm upwind of specimen; target 2 kg/m3 ±0.2 kg/m3, logged every 30 min; auto refill if drift > 5 %.
4.3 Air velocity
Vertical velocity 1.5 m/s ±0.2 m/s, calibrated with hot-wire anemometer at specimen geometric centre.
4.4 Vibration motor
Eccentricity 2 mm, 50 Hz, duty 5 s ON / 55 s OFF to keep the hopper clear yet avoid weld fatigue from continuous resonance.
V. In-test monitoring
5.1 Key sequence
a) 0–5 min: soft-start fan → dust pre-circulation → concentration OK.
b) 5 min–T: test dwell; log T, RH, concentration, velocity every 10 min.
c) T–T+5 min: heating off, fan speed down, vibrator runs 2 min to clear dust.
d) After T+5 min: main power off, open relief valve, wait 10 min before door opening.
5.2 Abort criteria
Stop immediately if:
— chamber temperature deviates > ±3 °C;
— dust concentration < 1.5 kg/m3 or > 2.5 kg/m3;
— vibrator current > 120 % rated;
— exhaust filter differential ≥ 1 500 Pa.
VI. Test termination and sample recovery
6.1 Settling
Keep door closed 15 min after stop; allow airborne dust to settle until concentration ≤ 0.02 g/m3.
6.2 Sample cleaning
a) Work in negative-pressure bench; blow with 0.2 MPa oil-free nitrogen top-down; no brushes that could scratch.
b) Gravimetric check: mass increase ≤ 10 mg deemed seal-tight.
c) Functional check: after 2 h recovery at 23 °C ±2 °C, 45 %–55 % RH, re-test insulation, sealing, optical and electrical performance.
VII. Cleaning and maintenance
7.1 Daily
— Vacuum chamber floor residues.
— Wipe viewing window and seals with ethanol.
— Check vibrator bolt torque (8.8 N·m).
7.2 Weekly
— Remove fan impeller, blow clean; replace any missing balance weights.
— Calibrate dust sensor zero & span.
— Drain compressor reservoir.
7.3 Yearly
— Replace HEPA and pre-filters.
— Entrust accredited body to re-calibrate temperature, velocity, concentration.
— Inspect contactors and relays; replace if outside tolerance.
VIII. Personnel protection and environmental controls
8.1 PPE
KN95 mask, goggles, anti-static gloves; prolonged inhalation of talc may cause pneumoconiosis—limit exposure to 2 h per entry.
8.2 Room conditions
Ambient RH ≤ 65 % to prevent dust clumping; conductive floor with earth ≤ 10 Ω; 5 kg ammonium-phosphate extinguisher provided for electrical fires.
IX. Documentation and traceability
9.1 Raw records
Include test order, pre-use checklist, calibration certificates, run curves, alarm screen shots, specimen photos (before & after).
9.2 Data retention
Electronic records ≥ 10 years, paper ≥ 3 years, ensuring traceability to every gramme of talc and every temperature fluctuation.
The reliability of a sand and dust test chamber is “30 % hardware, 70 % operation”. Only by integrating electrical safety, dust characteristics, airflow organisation, sequence control and personnel protection into a standardised management system can measurement repeatability be kept within 3 %, providing solid technical backing for R&D, quality arbitration and international trade. Each laboratory should compile its own Sand and Dust Test Operating Instruction based on these clauses and its specific chamber model, and review its effectiveness annually for continuous improvement.

News Recommendation
Are you familiar with the role of a thermal shock test chamber? This equipment is commonly used in environmental testing to evaluate the resistance of composite materials or material structures to repeated high and low temperatures, as well as the chemical changes or physical damage caused by thermal expansion and contraction.
A cold and hot shock test chamber is an environmental test equipment used to evaluate the performance and reliability of products under extreme temperature changes.
The salt spray test chamber is primarily used to evaluate the corrosion resistance of test samples. It is widely applied in industries such as electrical engineering, digital accessories, plastic products, and aerospace manufacturing to assess the corrosion resistance of products and simulate their performance under extreme environmental conditions.
A high-temperature test chamber simulates extreme heat environments to evaluate the performance and parameters of various materials or products under such conditions.
We’ve previously shared many articles about aging test chambers, covering topics such as pricing, structure, and usage. Today, let’s focus on the raw materials used in manufacturing these devices.
Product Recommendation
Telegram WhatsApp Facebook VK LinkedIn
亚洲欧美电影一区二区_麻豆国产一区二区_免费高清在线一区_久久免费高清视频
蜜臀99久久精品久久久久久软件| 韩日精品视频| 久久国产一区二区| 日韩天堂av| 曰本成人黄色| 国产亚洲精品久久飘花| 欧美日韩一区二区视频在线观看| 男女精品网站| 蜜臀va亚洲va欧美va天堂| 久久一区二区三区四区| 久久天堂av综合合色| 欧美一站二站| 欧美一区二区视频在线观看| 一区二区av在线| 国产精品99久久久久久有的能看| 亚洲深爱激情| 亚洲综合国产| 欧美一级一区| 久久久91精品| 牛人盗摄一区二区三区视频| 欧美~级网站不卡| 免费观看亚洲视频大全| 欧美大片91| 欧美va亚洲va日韩∨a综合色| 日韩午夜黄色| 亚洲调教视频在线观看| 亚洲女同在线| 久久久福利视频| 久久色在线播放| 欧美高清在线视频| 欧美色另类天堂2015| 国产精品免费在线| 国产日韩欧美二区| 亚洲第一精品电影| 99热免费精品| 午夜精品在线看| 久久精品99| 欧美xx视频| 欧美午夜激情在线| 国产欧美日韩三区| 在线播放亚洲一区| 一本久久青青| 欧美在线一区二区| 欧美激情中文不卡| 国产精品久久毛片a| 国产主播一区| 亚洲人成在线观看| 亚洲欧美日韩一区二区三区在线观看| 久久国产婷婷国产香蕉| 欧美1区2区3区| 国产精品久久久久久五月尺| 国产亚洲a∨片在线观看| 亚洲国产精品va| 亚洲深夜影院| 玖玖精品视频| 欧美日韩在线播放三区| 国产一区二区三区精品欧美日韩一区二区三区| 国语精品一区| 亚洲国产精品久久久久秋霞蜜臀| 亚洲视频免费| 久久天天躁夜夜躁狠狠躁2022| 欧美精品国产精品日韩精品| 国产精品久久久久影院色老大| 狠狠v欧美v日韩v亚洲ⅴ| 一区二区三区黄色| 久久久亚洲精品一区二区三区 | 亚洲综合成人婷婷小说| 亚洲免费av电影| 午夜视黄欧洲亚洲| 欧美成人精品一区二区| 国产精品女主播在线观看| 亚洲高清视频一区| 欧美亚洲在线播放| 欧美日韩国产一中文字不卡| 国产三区二区一区久久| 亚洲精品三级| 久久免费一区| 国产欧美视频一区二区三区| 在线观看成人网| 亚洲精品国偷自产在线99热| 欧美一区国产在线| 欧美国产日韩一区二区| 国产在线观看精品一区二区三区 | 欧美成人精品不卡视频在线观看| 欧美性大战久久久久久久| 一区二区三区在线观看国产| 99天天综合性| 亚洲一区高清| 久久精品国产99| 国产精品久久久久久久久久ktv| 亚洲黄一区二区三区| 久久爱www久久做| 欧美日韩一区在线播放| 亚洲国产综合视频在线观看| 久久久久久久久久看片| 国产麻豆精品视频| 一区二区国产日产| 欧美不卡视频一区发布| 韩国女主播一区二区三区| 亚洲一区精彩视频| 欧美日韩国产美| 亚洲毛片在线| 欧美岛国激情| 91久久精品美女高潮| 浪潮色综合久久天堂| 国产日韩欧美高清免费| 亚洲伊人第一页| 国产精品xxx在线观看www| 日韩西西人体444www| 美女成人午夜| 伊人久久综合| 久久人人看视频| 国产在线视频欧美| 久久精品最新地址| 国产一区二区三区视频在线观看 | 欧美粗暴jizz性欧美20| 国内精品久久久| 欧美一级在线视频| 国产九九精品| 亚洲欧美在线磁力| 国产精品日韩在线播放| 一区二区三区 在线观看视| 久久久久久亚洲综合影院红桃| 国产欧美欧洲在线观看| 亚洲一区二区三区涩| 欧美激情亚洲一区| 亚洲精品欧美专区| 欧美劲爆第一页| 亚洲精品乱码久久久久久按摩观 | 国产主播精品在线| 久久都是精品| 黄色成人免费观看| 久久综合综合久久综合| 在线观看日韩www视频免费| 先锋影音久久久| 国产精品乱码久久久久久| 一区二区三区亚洲| 美女久久一区| 亚洲伦理久久| 欧美日韩精品伦理作品在线免费观看| 日韩视频二区| 欧美性做爰猛烈叫床潮| 午夜精品av| 国产一区二区三区黄| 亚洲欧美日韩在线| 国产欧美精品在线| 欧美主播一区二区三区美女 久久精品人| 国产欧美日韩亚洲| 久久婷婷人人澡人人喊人人爽| 一区在线播放| 欧美激情精品久久久久久大尺度| 日韩视频免费在线观看| 国产精品美女久久久| 性8sex亚洲区入口| 激情久久婷婷| 欧美精品成人在线| 国内精品免费在线观看| 午夜精品美女久久久久av福利| 国产日韩亚洲| 欧美成人网在线| 一区二区三区日韩欧美| 国产精品男人爽免费视频1| 欧美一站二站| 亚洲精品三级| 国产免费成人| 欧美sm视频| 亚洲综合丁香| 亚洲国产日韩美| 欧美日韩岛国| 久久精品理论片| 99这里只有久久精品视频| 国产噜噜噜噜噜久久久久久久久| 久久一区二区三区四区| 欧美日韩成人综合| 亚洲一区免费| 国际精品欧美精品| 欧美国产欧美综合| 欧美中在线观看| 在线亚洲+欧美+日本专区| 狠狠色噜噜狠狠色综合久| 国产精品裸体一区二区三区| 欧美日韩美女在线| 欧美大秀在线观看| 久久综合伊人77777蜜臀| 久久精品视频在线观看| 午夜影视日本亚洲欧洲精品| 宅男精品导航| 99人久久精品视频最新地址| 亚洲国产婷婷| 亚洲黄色性网站| 亚洲高清在线播放| 亚洲国产99| 亚洲高清视频在线观看| 尤物视频一区二区| 黄色一区二区三区| 激情欧美国产欧美| 黄色成人在线网址| 红桃视频一区| 在线播放一区| 亚洲国产精品一区二区尤物区| 在线观看国产日韩| 亚洲国产精品久久精品怡红院| 亚洲国产经典视频| 亚洲三级电影全部在线观看高清|