Technical Specification and Key Control Points for the Installation of Salt Fog Chambers (Applicable to the pre-deployment of precision environmental simulation test equipment)

Source:LINPIN Time:2025-09-13 Category:Industry News

The salt fog chamber is the core instrument for evaluating the corrosion resistance of materials and protective coatings. Its measurement repeatability and reproducibility are directly affected by installation quality. Any deviation during on-site deployment may introduce systematic errors over subsequent hundreds or even thousands of hours of continuous testing, leading to data drift, misjudgement of sample failure, and increased shutdown maintenance costs. Therefore, installation must be included in the “first-inspection” regime and managed under a three-level quality control protocol of “plan – verify – confirm”. Based on GB/T 10587, GB/T 2423.17, ASTM B117 and ISO 9227, and integrating technical manuals of major domestic manufacturers, this document systematically reviews the key control points during installation and provides executable technical guidance for laboratories, inspection bodies and production sites.
Salt Fog Chambers
II. Installation Environment Requirements
A. Space Layout
Site-selection principle: give priority to an independent environmental simulation room; if restricted, place the chamber inside the plant, away from vibration sources (presses, air compressors, large motors) and strong electromagnetic interference sources (high-frequency hardening machines, welding stations).
Floor load: the fully loaded mass of the equipment (including saturator, heating water tank, specimen racks and 50 L salt solution) is usually ≥ 300 kg. Ensure a static floor load ≥ 500 kg/m2 and level the floor with a spirit level; longitudinal and transverse levelness ≤ 0.5 mm/m.
Clearances:
Rear ≥ 600 mm for condenser heat dissipation, circuit maintenance and saturator water filling;
Left/right sides ≥ 400 mm to avoid thermal radiation affecting adjacent equipment;
Front door area ≥ 1 000 mm to allow specimen loading/unloading and nozzle maintenance.
Ventilation & sunshine: room air-exchange rate ≥ 6 ACH. When organic salt fog (CASS, ASS) tests are run, provide a corrosion-resistant exhaust hood. Direct sunlight on the cabinet is forbidden to prevent ageing of PVC, PPS and other polymer parts.
B. Ambient Parameters
Temperature: 15 °C – 30 °C; relative humidity: ≤ 75 %RH; atmospheric pressure: 86 kPa – 106 kPa; no flammable, explosive or corrosive gases; dust concentration ≤ 0.2 mg/m3.
III. Technical Specifications for Utility Interfaces
A. Power Supply System
Rated voltage: AC 220 V ± 10 % / 50 Hz or AC 380 V ± 10 % / three-phase five-wire system, exactly as indicated on the nameplate.
Protective earthing: independent PE conductor, yellow-green, cross-section ≥ 2.5 mm2; earth resistance ≤ 4 Ω.
Residual-current protection: 30 mA residual-current circuit-breaker, trip time ≤ 0.1 s, on a separate branch from the laboratory main switch to avoid nuisance tripping.
Voltage stabilisation & isolation: if mains variation > ± 10 %, add a 5 kVA on-line UPS or precision voltage regulator to prevent heater and PLC damage by over-voltage.
B. Compressed-Air System
Air quality: comply with ISO 8573-1:2010 class [2:4:2], i.e. solid particles ≤ 0.5 μm, oil content ≤ 0.1 mg/m3, pressure dew point ≤ 3 °C.
Supply pressure: stabilise at 0.7 MPa – 0.8 MPa before the chamber, then reduce to 0.1 MPa – 0.2 MPa by a two-stage regulator for the nozzle; during testing the pressure must not fall below 0.3 MPa (3 kgf/cm2).
Piping material: Φ 8 mm × 1 mm transparent PU tube or 316 L stainless-steel tube; galvanised steel is forbidden to prevent Zn2? contamination of the salt solution.
Quick couplings: PC8-02 self-locking type, rated 1.5 MPa, ≥ 500 connect/disconnect cycles, ensuring maintenance efficiency.
Continuous air supply: for test cycles > 72 h, provide a ≥ 100 L air receiver plus refrigerant dryer to avoid pressure pulsation caused by frequent compressor start/stop.
C. Water Supply System
Water quality: de-ionised or distilled water with conductivity ≤ 5 μS/cm must be used for the saturator, seal trough and heating tank; nozzle rinsing may use laboratory grade-2 water (GB/T 6682).
Pressure & flow: inlet 0.1 MPa – 0.3 MPa; automatic make-up line fitted with a 40 mesh Y-strainer and a non-return valve to prevent impurities and siphoning.
Tank capacity: external 20 L PE tank with level alarm and low-level automatic shutdown.
IV. Emission & Environmental Requirements
A. Drain Line
Material: acid/alkali-resistant PVC-U, OD 32 mm, wall 2.0 mm, solvent-cement joints.
Gradient: horizontal section ≥ 3 %; “negative slope” and U-traps are forbidden to prevent salt-solution back-flow.
End-of-line treatment: discharge into laboratory neutralisation pit; adjust pH to 6.5 – 8.5 with NaOH before entering factory sewer. If copper salt (CASS) is used, add a Na?S precipitation tank; Cu2? ≤ 0.5 mg/L before discharge.
B. Exhaust Line
Material: same as above, Φ 50 mm PVC-U, temperature ≤ 60 °C.
Routing: chamber top mist outlet → local exhaust hood → corrosion-resistant centrifugal fan → outdoor vertical stack; outlet ≥ 1 m above roof with weather-cap.
Back-flow prevention: horizontal section ≥ 2 % gradient, outdoor end lower than indoor; if necessary, fit a PVC non-return valve.
Mist recovery: a “salt-mist catcher” (multi-stage PP packing + demister pad) is recommended; collection efficiency ≥ 90 % to reduce NaCl particle corrosion of roof steelwork.
C. Sealing & Leak Test
All pipe joints use EPDM corrosion-resistant O-rings plus PVC solvent cement double seal. After installation, conduct a 15 kPa pressure-hold test; pressure drop ≤ 0.5 kPa in 10 min is acceptable.
V. On-Site Commissioning & Acceptance
A. No-Load Run
Temperature deviation: 35 °C ± 2 °C (neutral salt fog). Calibrate with a certified multi-point logger, nine-point layout; deviation ≤ ± 1 °C.
Salt-fog settlement: 80 cm2 funnel method, continuous spraying 24 h; average settlement 1.0 – 2.5 mL/h; four-point spread ≤ 0.4 mL/h.
Pressure stability: automatically record supply-pressure curve; fluctuation ≤ ± 0.01 MPa.
B. Loaded Run
Place standard steel panels (Q235, Ra ≤ 0.8 μm); after 48 h, corrosion grade ≥ grade 4 of GB/T 6461-2002, and difference between upper and lower samples ≤ 1 grade, proving spray uniformity.
C. Documentation
Commissioning report, earth-resistance record, water-quality certificate, leak-test record and training attendance sheet are filed and kept ≥ 6 years.
VI. Common Installation Defects & Corrective Actions
Defect: drain pipe laid horizontal without gradient, causing solution back-flow after shutdown and heater corrosion perforation.
Correction: dismantle horizontal section; re-route with ≥ 3 % gradient and add a transparent sight tube for inspection.
Defect: air compressor not fitted with refrigerant dryer; moist air causes frequent nozzle blockage.
Correction: add refrigerated dryer + fine filter; drain condensate weekly; replace nozzle with Si?N? ceramic to triple service life.
Defect: exhaust pipe passes directly through wall to outdoors without rain protection; rain water back-flow causes inner tank corrosion.
Correction: fit 45° elbow + weather-cap on outdoor end; add a drain tee at the lowest point for periodic manual discharge of condensate.
VII. Personnel Training & Maintenance Pre-Conditions
After installation, the manufacturer’s engineer shall train operators, maintenance staff and safety officers on site; 100 % pass in the assessment is required before hand-over.
Establish a three-level (daily, weekly, monthly) check list covering: water level, pressure, nozzles, O-rings, pipe leakage, earth continuity.
Spare-parts store: 2 nozzles, full set of EPDM O-rings, 5 m PU tube, 5 each of 2 A / 10 A fuses, ensuring fault response time ≤ 4 h.
VIII. Conclusion
Installation quality is the first gateway to guaranteeing the metrological characteristics and service life of a salt fog chamber. Strictly following the four control modules of space layout, utilities, emission & environment, and commissioning & acceptance, supplemented by full-process records and risk-prevention thinking, can reduce the potential failure rate by more than 70 % and provide a stable, reliable and traceable test environment for subsequent material corrosion evaluation. It is hoped that every laboratory and on-site engineer will use this specification as a blueprint, refine the work instruction in line with actual conditions, and achieve the goal of “well installed, accurately measured, long-lasting”.

News Recommendation
If your salt spray test chamber experiences spray failure, the issue may be a clogged nozzle. So, how should you handle nozzle clogging? Here’s a clever trick from our experts—a simple guide on how to resolve nozzle blockages in testing equipment.
The sand and dust test chamber is used to evaluate the dust resistance of objects in sandy and dusty environments. Currently, this equipment is widely applied across various fields. Today, we will focus on its application in the military industry.
Now that winter has arrived and snow has begun to fall in some areas, how can companies properly maintain their UV aging test chambers while in use?
Walk-in dust and sand test chambers are designed to simulate natural sandstorm conditions to test the protective performance of large equipment, while IP56X dust and sand chambers focus on shell sealing detection and are suitable for small and medium-sized electronic and electrical products.
To meet various market demands, many types of testing chambers have been developed, among which the salt spray test chamber is one of the most common.
Product Recommendation
Telegram WhatsApp Facebook VK LinkedIn
亚洲欧美电影一区二区_麻豆国产一区二区_免费高清在线一区_久久免费高清视频
亚洲欧美高清| 亚洲福利久久| 亚洲最新合集| 欧美sm视频| 经典三级久久| 久久成人精品电影| 国产精品萝li| 亚洲图片在线观看| 欧美日韩在线一区二区| 亚洲精品国产欧美| 欧美不卡在线| 亚洲国产精品精华液网站| 久久三级视频| 伊人久久大香线蕉av超碰演员| 欧美一区二区三区的| 国产精品一区二区三区四区五区 | 亚洲精品久久久一区二区三区| 久久综合999| 一区二区视频在线观看| 久久永久免费| 亚洲国产精品久久久久婷婷884 | 激情综合色综合久久| 久久狠狠一本精品综合网| 国产有码在线一区二区视频| 久久国产精品网站| 一区二区三区无毛| 免费成人激情视频| 91久久精品国产91性色tv| 欧美激情偷拍| av成人天堂| 国产精品精品视频| 亚洲欧美网站| 国产一区二区无遮挡| 久久久91精品| 91久久国产精品91久久性色| 欧美精品久久99久久在免费线| 99国产精品99久久久久久粉嫩 | 欧美视频在线观看免费| 亚洲图片你懂的| 国产嫩草一区二区三区在线观看| 欧美一区二区三区婷婷月色 | 久久综合国产精品台湾中文娱乐网| 国内欧美视频一区二区| 老司机午夜免费精品视频| 亚洲精品一区二区三| 欧美色精品天天在线观看视频| 亚洲伊人一本大道中文字幕| 国产日韩欧美91| 久久久国产精品亚洲一区| 亚洲福利av| 欧美日韩中文| 欧美一级二区| 亚洲国产婷婷香蕉久久久久久99| 欧美日韩小视频| 欧美一区二粉嫩精品国产一线天| 伊人久久大香线| 欧美片第一页| 欧美一区二区三区播放老司机| 激情亚洲成人| 欧美日韩亚洲三区| 欧美在线综合视频| 最新日韩中文字幕| 国产精品免费网站| 久久综合伊人77777麻豆| 日韩亚洲视频| 国际精品欧美精品| 欧美日本韩国一区| 欧美一区二区三区在线观看| 亚洲国产精品一区制服丝袜| 国产精品二区三区四区| 久久天天躁狠狠躁夜夜爽蜜月| 亚洲美女视频网| 国产精品一区二区欧美| 欧美成人综合| 欧美一级免费视频| 亚洲精品一区二区三区蜜桃久| 国产麻豆成人精品| 欧美经典一区二区三区| 欧美在线综合| 日韩一级大片| 精品动漫3d一区二区三区| 欧美日韩一区二区在线 | 欧美一区二区三区在线观看| 亚洲三级免费观看| 国产亚洲欧美日韩美女| 欧美日韩第一区| 久久久久88色偷偷免费| 亚洲视屏在线播放| 亚洲国产精品ⅴa在线观看 | 国产精品一二一区| 欧美精品免费在线观看| 久久精品亚洲一区| 亚洲永久精品国产| 亚洲日本一区二区| 精东粉嫩av免费一区二区三区| 国产精品卡一卡二卡三| 欧美精品xxxxbbbb| 久久频这里精品99香蕉| 亚洲在线电影| 99ri日韩精品视频| 亚洲国产成人精品久久| 国产欧美一区二区三区另类精品 | 另类图片国产| 久久国产一二区| 亚洲欧美电影院| 在线视频一区观看| 亚洲日本成人在线观看| 激情丁香综合| 国产亚洲电影| 国产精品久久久久久一区二区三区| 欧美大片一区二区| 久久免费一区| 欧美在线视频二区| 亚洲欧美在线一区二区| 一区二区黄色| 国产美女精品免费电影| 国产精品久久久久久av福利软件 | 久久久久久成人| 欧美一区视频| 性欧美办公室18xxxxhd| 亚洲一区二区三区色| 一二美女精品欧洲| 亚洲美女视频在线免费观看| 91久久夜色精品国产九色| 在线精品视频在线观看高清| 国内精品视频666| 国产一区二区欧美日韩| 国产欧美韩国高清| 国产精品一区二区久久久久| 国产精品久久久久国产精品日日| 欧美日韩影院| 欧美日韩伊人| 欧美午夜精品理论片a级大开眼界| 欧美精品在线网站| 欧美日本视频在线| 欧美美女bbbb| 欧美日韩视频在线第一区| 欧美日韩ab| 欧美视频手机在线| 欧美特黄一级| 国产精品成人在线| 国产精品免费看久久久香蕉| 国产精品日韩在线一区| 国产九色精品成人porny| 国产美女一区二区| 国产亚洲精品自拍| 红杏aⅴ成人免费视频| 1000部国产精品成人观看| 亚洲福利视频二区| 亚洲狼人综合| 一区二区三区日韩在线观看| 亚洲无限乱码一二三四麻| 亚洲制服欧美中文字幕中文字幕| 亚洲免费中文字幕| 欧美一级久久| 久久精品中文| 欧美69视频| 欧美日韩一区在线观看视频| 欧美视频一二三区| 国产美女精品人人做人人爽| 狠狠色综合日日| 亚洲人成免费| 亚洲视频在线观看网站| 午夜精品一区二区三区在线视| 欧美亚洲一区二区三区| 久久久亚洲精品一区二区三区| 欧美不卡一卡二卡免费版| 欧美日韩精品| 国产日韩精品电影| 在线精品视频在线观看高清| 亚洲理论电影网| 亚洲欧美另类在线| 久久久最新网址| 欧美日韩精品是欧美日韩精品| 国产精品日韩一区二区三区| 韩日成人在线| 亚洲精品综合精品自拍| 亚洲欧美一区二区三区极速播放 | 欧美1区3d| 欧美性一二三区| 国内一区二区在线视频观看| 亚洲精品久久在线| 午夜精品一区二区三区电影天堂| 久久一区二区三区超碰国产精品| 欧美乱在线观看| 国产欧美精品va在线观看| 亚洲国产成人高清精品| 亚洲图中文字幕| 久久蜜桃精品| 欧美午夜精彩| 在线观看中文字幕亚洲| 国产精品99久久久久久久女警| 久久精精品视频| 欧美日韩你懂的| 黄色成人免费观看| 中文亚洲字幕| 玖玖精品视频| 国产精品国产自产拍高清av| 在线看无码的免费网站| 亚洲桃色在线一区| 久久综合精品一区| 国产美女精品| 一区二区三区日韩精品视频| 久久这里有精品15一区二区三区|