亚洲欧美电影一区二区_麻豆国产一区二区_免费高清在线一区_久久免费高清视频

Search for the product you are looking for
研發中心

News

Slide down

Safe and Precise Operation Technical Specifications and Risk Prevention & Control System for High and Low Temperature Alternating Test Chambers

Source:LINPIN Time:2025-11-20 Category:Industry News

As a core piece of equipment in the field of environmental reliability testing, high and low temperature alternating test chambers play an irreplaceable role in the quality verification processes for electronic components, aerospace materials, automotive parts, chemical products, and other industries. However, during practical application, some operators often neglect several critical operational details due to insufficient understanding of the equipment’s operational mechanisms or inadequate safety awareness. These seemingly trivial aspects actually pose potential risks to the accuracy of test data, operational stability of the equipment, and personnel safety. To ensure efficient testing processes, precise test results, and a safe working environment, the following systematic elaboration on standardized operating procedures and risk prevention and control points for high and low temperature alternating test chambers is hereby presented, aiming to provide technical support for laboratory standardization management.

1. Electrical Safety Protection and Reliability Management of Grounding Systems
During initial equipment installation and positioning, strict implementation of chassis grounding protection measures is mandatory. This requirement is based on fundamental electrical safety standards, aiming to establish a reliable fault current discharge path to prevent electric shock accidents caused by damaged power cord insulation, internal component leakage, or induced voltage accumulation. The grounding resistance value must be periodically tested using a professional grounding resistance tester to ensure it is no greater than 4 ohms, complying with GB 4793.1 Safety Requirements for Electrical Equipment for Measurement, Control, and Laboratory Use. The grounding conductor should be a yellow-green dual-color copper core cable with a cross-sectional area of no less than 2.5mm2, and must be securely connected to the laboratory’s independent grounding network; series grounding or virtual connection is prohibited. Neglecting this requirement may cause the equipment chassis to become energized, posing a fatal threat to operators, while also easily causing control system signal interference and resulting in temperature control deviation.
2. Prohibited Operations for Chamber Door Opening/Closing and Temperature Field Stability Mechanisms
During equipment operation of heating and cooling programs, non-essential opening of the test chamber door is strictly prohibited. Opening the door will directly cause violent convection of cold and hot air between the workspace and external environment, destroying the established uniform temperature field distribution and causing local temperature fluctuations exceeding ±5℃, severely affecting test condition stability. More critically, opening the door under high-temperature conditions may cause hot air surges, leading to facial and hand burns for operators; opening under low-temperature conditions will allow large amounts of moist hot air to intrude, quickly frosting the evaporator surface, blocking air channels, reducing heat exchange efficiency, and even causing compressor liquid slugging damage. If opening the door is indeed necessary for observing sample status, this should be done through the observation window; if opening is mandatory, it should be performed when the test chamber is in the normal temperature range (25±5℃) and in a stopped state, with the opening angle not exceeding 30° and duration controlled within 15 seconds.
3. Start-Stop Interval Control for Refrigeration Systems and Compressor Protection Strategies
When the refrigeration unit has been shut down for a short period of 15 minutes, immediate restart is strictly prohibited. This restriction stems from the pressure balance requirements and lubricating oil return mechanism inside the compressor. At the moment of shutdown, the high-pressure side pressure of the system can still reach over 1.5 MPa, while the low-pressure side is in a vacuum state. Forced starting will cause the motor load torque to exceed the rated value by more than 300%, leading to overheating burnout of windings or breakdown of starting capacitors. Simultaneously, a compressor without sufficient oil return may cause lubrication failure of moving parts, accelerating mechanical wear. The correct operational specification is: after shutdown, wait at least 20-30 minutes for the high-low pressure differential to naturally balance and lubricating oil to fully return to the crankcase before restarting. For equipment equipped with intelligent controllers, the system has a built-in delay protection of 3-5 minutes. Manual operations should avoid frequent switching, with daily start-stop cycles not exceeding 6 times.
4. Principle of Independent Power Configuration for High Heat-Generating Samples
If the total heat-generating power of loaded samples exceeds the heat load limit corresponding to the workspace volume (typically calculated as 50W/L), an external independent power supply must be used; direct use of internal equipment sockets is strictly prohibited. The internal power circuit design only bears conventional signal transmission and low-power drive loads, with its rated current generally not exceeding 5A. Connection of high-current loads will cause internal circuit overload heating, accelerated insulation layer aging, and even short-circuit fires. When configuring independent power supplies, ensure the power supply line capacity matches, recommend using cables with a cross-sectional area of no less than 1.5mm2, and install independent leakage protection circuit breakers. Sample power cables and equipment control cables should be routed separately, maintaining a distance of more than 10cm to avoid electromagnetic interference affecting temperature sensor signal accuracy.
5. Restrictions on Chamber Door Opening During High-Low Temperature Transition
When executing test profiles transitioning from high to low temperature, chamber door opening time must be strictly controlled to the minimum. After the high-temperature phase, the workspace temperature may reach over 150℃. Rashly opening the door at this time will not only cause the sample to suffer unexpected thermal shock but also generate severe temperature gradients and dew point changes inside the chamber. Moisture-laden hot air rapidly condenses upon encountering cold, forming large amounts of water droplets on air duct panels, sensor sheaths, and sealing strips; this moisture may freeze and expand during subsequent low-temperature phases, causing structural component deformation, rupture of platinum resistance sensor encapsulation, or seal failure. Standard operation requires: if sample adjustment is needed during the holding platform after the heating phase, wait until temperature drops below 60℃ before opening the door, with opening time not exceeding 10 seconds, while quickly wiping visible condensation with absorbent paper.
6. Periodic Verification Mechanism for Safety Protection Devices
The built-in circuit breaker and over-temperature protector are the final defense lines for safeguarding samples and personnel, requiring a regular inspection mechanism. Circuit breakers should undergo breaking capacity testing monthly, using specialized testers to simulate short-circuit currents, verifying whether they can remain non-tripping within 1 hour at 1.13 times rated current and reliably trip within 1 hour at 1.45 times rated current. Over-temperature protectors (typically bimetallic or electronic temperature switches) must be calibrated quarterly using standard temperature sources, with set-point deviation not exceeding ±2℃. During calibration, the main control circuit should be disconnected, and the protector probe placed together with a standard thermocouple in the temperature field to record its action temperature value. If protection device failure is detected, equipment must be immediately stopped and replaced with original certified spare parts; shielding or short-circuiting protection loops for non-compliant operations is strictly prohibited.
7. Energy Consumption Management and Heat Load Control for Lighting Systems
The built-in lighting device of the test chamber should be turned off promptly after sample loading is completed. Although lighting fixtures have relatively low power (typically 15-25W), their cumulative heat generation effect cannot be ignored. Under -40℃ low-temperature conditions, the radiant heat from a single fixture can raise local area temperature by 2-3℃, compromising temperature uniformity indicators. Meanwhile, prolonged operation of lighting accelerates lamp lumen depreciation, shortens service life, and increases unnecessary energy consumption. Modern equipment mostly adopts LED cold light sources, but it remains recommended to keep them off when not necessary. An intelligent mode can be set through the controller: “turn on when door opens, automatically turn off after 30 seconds when door closes,” achieving a balance between energy saving and convenience.
8. Dehumidification Pre-treatment Procedure Before Low-Temperature Testing
Before implementing sub-freezing temperature testing, thorough drying treatment of the workspace interior is mandatory. Residual moisture will solidify into ice crystals under low-temperature environments, potentially blocking air circulation channels, freezing and swelling sample rack fixing structures. More seriously, when moisture penetrates temperature sensor sheaths or equipment gaps, the mechanical stress from freezing expansion can reach over 200 MPa, sufficient to destroy the ceramic framework of PT100 platinum resistance sensors or cause seal ring cracking. The standard dehumidification procedure is: at room temperature, open the chamber door for ventilation for 30 minutes, use clean non-woven fabric to wipe the inner walls, air deflectors, and sample racks; then start the equipment and operate at 80℃ for 1 hour for baking dehumidification, only transferring to the low-temperature program after humidity drops below 10%RH. For extremely low-temperature tests (below -70℃), it is recommended to additionally place silica gel desiccant and install a vacuum drying interface.
9. Heat Balance Waiting Requirements After Test Completion
After the test program terminates, immediate opening of the workspace door is strictly prohibited. The internal temperature may still be in an extreme state (high temperature reaching 180℃ or low temperature reaching -70℃). Immediate door opening will cause violent air convection and heat exchange. Under high-temperature conditions, the outflowing air stream temperature can exceed 100℃, far beyond human tolerance limits, causing second-degree burns within 2 seconds of contact; under low-temperature conditions, instantaneous vaporization of cold air may cause rapid dew point drop in the local micro-environment, frosting the sample surface and affecting subsequent measurement accuracy. The correct practice is: wait for the equipment to naturally return to below 60℃ (after high-temperature tests) or above -10℃ (after low-temperature tests), or execute a “return to normal temperature” program through the controller. Only when the temperature approaches ambient temperature and the pressure balance indicator lights up can the chamber door be opened. This process typically requires 30-60 minutes, depending on the set temperature extreme and workspace volume.
10. Personal Protection Standards for High-Temperature Sample Removal
When retrieving samples from equipment that has just completed high-temperature testing, thermal protective gloves conforming to GB 24541 Hand Protection – Protective Gloves Against Chemicals and Micro-Organisms must be worn. Sample surface temperatures may remain consistent with set values; for example, a sample at 150℃ can still maintain over 120℃ for 5 minutes, and direct contact will cause severe burns. It is recommended to use aramid fiber or asbestos-coated thermal insulation gloves with a Contact Heat Protection Performance Index (HTI) greater than 24, ensuring at least 15 seconds of protection when contacting objects at 300℃. Sample retrieval actions should be swift and accurate, assisted by specialized high-temperature-resistant fixtures. After removal, samples should be immediately placed on ceramic fiber insulation pads with warning signs set up. It is advisable to equip the retrieval area with emergency shower facilities and develop burn emergency response plans to ensure immediate handling when incidents occur.
11. Influence Mechanism of Sample Loading Layout on Temperature Field Uniformity
Test sample placement should follow the principle of uniform distribution, occupying 1/3 to 2/3 of the workspace effective volume, while ensuring unobstructed air circulation channels. Overly dense stacking will obstruct airflow organization, reducing local wind speed to below 0.5m/s, causing temperature change rates to decrease by over 40% and generating temperature gradients exceeding ±5℃, failing to meet the uniformity requirements specified in GB/T 2423.1 standard. Samples should maintain at least 5cm spacing between them, and no less than 10cm distance from inner walls; the areas of air outlet and return openings must not be blocked. For irregular-shaped samples, use hollowed sample racks and adjust placement angles to avoid forming eddy dead zones. The total load mass is recommended not to exceed 80% of the equipment’s nominal capacity to prevent overload wear of transmission components.
12. Risks of Live Operation of Communication Interfaces and ESD Protection Procedures
When connecting equipment to computers for program setting or data acquisition, physical interface connection must be completed in a powered-off state. Live insertion/removal of DB9 serial ports or RJ45 network ports may generate induced voltage of dozens of volts, breaking down the CMOS circuits of controller communication chips, causing communication interruption, data loss, or even motherboard damage. Interface circuits generally lack hot-swap protection design, and electrostatic discharge (ESD) constitutes the primary threat. The standard procedure is: first turn off the main equipment power and wait 5 minutes for capacitor discharge, then turn off the computer power, followed by cable connection, and finally power on sequentially. Anti-static wrist straps should be worn during connection, with interface screws tightened to avoid signal fluctuations caused by poor contact. It is recommended to use opto-isolated communication modules to electrically isolate the communication loop from the main control loop, enhancing anti-interference capability.
13. Energy Management and Electrical Safety Protection During Equipment Idle Periods
After test tasks are completed, the equipment’s main power switch should be completely turned off, not just the stop button on the operation panel. Equipment standby status still consumes 30-50W power, with control systems and sensors remaining energized, wasting energy and increasing lightning surge damage risk. Cutting off the main power can prevent damage to precision components from abnormal nighttime power grid voltage fluctuations and reduce electrical fire probability. The shutdown procedure should be: first execute normal shutdown process through the controller, wait for the compressor and fan to completely stop operating, then disconnect the main power circuit breaker, and finally turn off the laboratory distribution box branch switch. For long-term deactivation (exceeding 7 days), it is recommended to unplug the power cord and place desiccant packs inside the control cabinet to prevent moisture侵蝕 circuit boards. Before reactivation, insulation resistance testing must be performed to ensure it is not less than 2MΩ.
Comprehensive Management System Construction and Continuous Improvement Mechanisms
In summary, the safe and precise use of high and low temperature alternating test chambers is a systematic engineering project involving multiple dimensions including electrical safety, thermal control, mechanical protection, and personnel behavior norms. Laboratory managers should incorporate the aforementioned points into Standard Operating Procedures (SOP), organize quarterly refresher training for operators, and strengthen execution supervision through video monitoring and data auditing. Only by internalizing normative awareness and externalizing it in actions can the equipment’s performance potential be fully realized, ensuring high-quality test data output, while constructing solid safety protection barriers for personnel and equipment, achieving long-term stable and efficient laboratory operations. For abnormal situations not covered in the procedures, a rapid response channel should be established to promptly contact the equipment manufacturer’s technical support team, avoiding problem escalation caused by blind handling.

News Recommendation
Given that temperature and humidity alternating test chambers are expensive, it is crucial to keep certain precautions in mind when using the equipment to ensure better protection and maximize its value.
Temperature shock test chambers on the market are divided into two main types. One type is the two-chamber model, which includes a high-temperature zone and a low-temperature zone.
Why is it necessary to change the water regularly in a formaldehyde test chamber?
Are you familiar with the role of a thermal shock test chamber? This equipment is commonly used in environmental testing to evaluate the resistance of composite materials or material structures to repeated high and low temperatures, as well as the chemical changes or physical damage caused by thermal expansion and contraction.
By subjecting products to various temperature environments—such as high temperature, low temperature, and alternating humidity—constant temperature and humidity test chambers can evaluate the heat resistance, cold resistance, dryness resistance, and moisture resistance of materials under different climatic conditions.
Product Recommendation
Telegram WhatsApp Facebook VK LinkedIn
亚洲欧美电影一区二区_麻豆国产一区二区_免费高清在线一区_久久免费高清视频
欧美日韩一区二区三区四区在线观看 | 久久久www| 欧美在线观看网站| 久久躁狠狠躁夜夜爽| 欧美激情国产精品| 欧美日韩中文字幕在线视频| 国产精品久久一级| 精品成人久久| 日韩网站在线看片你懂的| 亚洲美女在线看| 欧美亚洲专区| 欧美激情一区二区三区四区 | 欧美国产综合视频| 欧美日韩国产综合新一区| 国产伦精品一区二区三区视频孕妇| 国产一区二区三区久久久| 91久久国产精品91久久性色| 亚洲午夜一区二区三区| 久久精品一区中文字幕| 欧美高清自拍一区| 国产农村妇女毛片精品久久莱园子| 激情成人亚洲| 亚洲一区bb| 欧美jizz19性欧美| 国产日本欧美在线观看| 亚洲精品视频啊美女在线直播| 亚洲欧美日韩一区二区| 另类天堂视频在线观看| 在线亚洲激情| 欧美一区二区三区在线| 欧美精品一区二区视频| 国模精品一区二区三区| 一个色综合av| 久久影院午夜片一区| 国产精品国产三级国产aⅴ入口 | 欧美三级资源在线| 狠狠综合久久av一区二区老牛| 亚洲视频axxx| 欧美3dxxxxhd| 国产一区二区三区四区| 亚洲网站在线播放| 欧美国产极速在线| 黄色国产精品| 小嫩嫩精品导航| 国产精品va在线播放我和闺蜜| 揄拍成人国产精品视频| 亚洲图片欧洲图片日韩av| 欧美jizzhd精品欧美巨大免费| 国产一区在线视频| 亚洲欧美成人| 欧美日韩亚洲综合一区| 亚洲丶国产丶欧美一区二区三区| 亚洲免费人成在线视频观看| 欧美搞黄网站| 亚洲大胆女人| 久久免费视频在线| 国产午夜亚洲精品不卡| 亚洲欧美日韩精品久久久| 欧美日韩国产一区| 亚洲精品美女免费| 你懂的视频欧美| 影音先锋成人资源站| 欧美综合第一页| 国产日产欧产精品推荐色 | 99re成人精品视频| 久久视频在线看| 国产亚洲综合精品| 亚洲制服av| 欧美性一二三区| 一本色道久久88精品综合| 女人色偷偷aa久久天堂| 尤物九九久久国产精品的特点 | 国产欧美一区二区三区视频| 亚洲视频在线观看三级| 欧美日韩精品一区| aa亚洲婷婷| 欧美日韩免费一区二区三区| 亚洲毛片视频| 欧美人与性动交α欧美精品济南到| 亚洲国产精品久久久久久女王| 麻豆成人综合网| 亚洲电影网站| 欧美成人在线免费视频| 亚洲韩国一区二区三区| 欧美好骚综合网| 日韩视频一区二区在线观看| 欧美日韩久久| 亚洲一区在线视频| 国产精品乱人伦中文| 亚洲欧美日韩国产综合| 国产精品亚洲综合一区在线观看| 翔田千里一区二区| 国内精品国产成人| 久热精品视频在线观看| 亚洲国产精品毛片| 欧美伦理一区二区| 亚洲视频第一页| 国产精品网站一区| 欧美在线观看网址综合| 黄色免费成人| 欧美国产另类| av不卡在线看| 国产精品中文在线| 久久久水蜜桃| 最新精品在线| 国产精品高潮呻吟久久av黑人| 亚洲免费视频成人| 国产一区深夜福利| 欧美v亚洲v综合ⅴ国产v| 夜夜狂射影院欧美极品| 国产精品资源| 另类人畜视频在线| 中文av字幕一区| 国产欧美大片| 牛人盗摄一区二区三区视频| 一区二区精品| 国产在线成人| 欧美精品在线视频| 午夜亚洲福利在线老司机| 伊人成综合网伊人222| 欧美日韩精品系列| 久久精品官网| 99re6这里只有精品| 国产日韩专区| 欧美激情一区| 欧美一区二区黄色| 亚洲精品乱码| 国产日韩欧美成人| 欧美激情在线有限公司| 亚洲欧美日韩另类| 亚洲大胆人体在线| 国产精品久久久久免费a∨大胸| 久久天堂国产精品| 亚洲一区二区精品在线观看| 一区二区在线观看av| 欧美四级在线| 久热精品在线视频| 亚洲在线一区二区三区| 亚洲高清在线| 国产精品网站在线| 欧美电影免费观看网站| 午夜视频一区| 亚洲美女中文字幕| 红杏aⅴ成人免费视频| 欧美色图麻豆| 麻豆成人综合网| 亚洲欧美亚洲| 日韩亚洲欧美高清| 雨宫琴音一区二区在线| 欧美亚州一区二区三区| 久久综合九色综合网站| 亚洲一区二区视频在线| 亚洲高清久久网| 国产午夜久久久久| 欧美日一区二区三区在线观看国产免| 欧美一级久久| 亚洲视频自拍偷拍| 亚洲国产老妈| 国产一区二区剧情av在线| 欧美视频中文一区二区三区在线观看 | 中文精品在线| 伊人影院久久| 国产精品午夜av在线| 欧美暴力喷水在线| 欧美专区福利在线| 中国av一区| 亚洲精品国产精品国产自| 韩日成人av| 国产嫩草一区二区三区在线观看| 欧美日韩色婷婷| 欧美成人国产| 久久视频一区| 欧美一区二区三区四区在线观看地址 | 亚洲高清网站| 国产曰批免费观看久久久| 国产精品久久久久久久久久久久久久| 欧美高清视频| 蜜桃精品久久久久久久免费影院| 欧美一区二区在线免费播放| 亚洲一区二区动漫| 99视频精品全部免费在线| 亚洲国产一区二区在线| 一区久久精品| 一区二区亚洲欧洲国产日韩| 国产午夜精品视频| 国产农村妇女精品一二区| 国产精品久久77777| 欧美日韩亚洲国产一区| 欧美精品在线观看一区二区| 欧美xx视频| 欧美成人午夜激情在线| 免费日本视频一区| 玖玖玖免费嫩草在线影院一区| 久久精品一区蜜桃臀影院| 久久精品国产69国产精品亚洲 | 欧美一区二区三区在线看| 亚洲一区二区成人在线观看| 一区二区高清在线观看| 日韩网站在线观看| 日韩一级在线观看| 99视频一区二区三区| 一本色道久久综合狠狠躁的推荐| 亚洲精品久久久一区二区三区| 最新亚洲激情|